Roll Out

Updated by Leigh Hutchens

When you are happy with your base schedule, it's time to roll it out (activate it) so that the shifts appear in the schedule. To roll out, go to "Base Schedule" and click the "Roll out" in the top right-hand corner. This will bring out a side panel. In this side panel, you're able to select a from and to date to which the Base schedule should be applied.

This is where you can:

  • Roll out your base schedule and handle warnings
  • Continue rotation from a previous rollout
  • Roll out a base schedule over an absence

Read more information about rolling out your base schedule HERE.


How Did We Do?